Skip to content

ASTM E907 Roof uplift testing (FM 1-52)

Roof maintenance, repairs, and replacements.

Field Verified will perform a survey of the existing roof and roof penetrations to identify current issues and sources of potential future issues.

ASTM E907

Everything you need to know about Roof Assessment.

This effort will include a review of existing roof penetrations, roof top equipment mounts and roof terminations, parapet wall coping, perimeter flashing, roof membrane condition and other adjacent roof conditions that may affect the watertight integrity of the building.

The report can be provided within 2 days of completing the survey. Several roof consultants will be committed to this effort. The results of this effort will be included in a comprehensive report detailed below.

Recommendations

Roof maintenance, repairs and replacement recommendations will be projected for a ten-year period and provided in the report for each roof component. This will include the estimated remaining service life (ERSL) and recommended replacement date that is outside of the ten-year plan period for any applicable components.

Projected cost of repairs will be provided for each condition and provided in a comprehensive spreadsheet. Basis of Design repair materials will be listed as well.

Construction worker at work.

Summary report and detailed roof plan

Field Verified will provide a full report of the Roof Condition Survey results on a roof plan document of the roof area. The report will include photographs of the roof field, details and existing defects for documentation and future reference. All photos will be electronically linked to the exact location on a roof plan or aerial view. Similarly, all deficiencies will be physically marked on the roof and their location documented on the roof plan.

A narrative summary will be included in the report and include a description of the testing, any areas excluded from testing do to inadequate access, the extent of the survey, the general findings of each and any recommendations.

The report format will allow for the inclusion of any photos provided by the contractor or captured during or after repairs. If the Roof Moisture scan is conducted, areas of elevated moisture will be marked and photo of the condition will be attached.

LET’S ADD YOUR PROJECT TO THE LIST

Request a Quote

Reach out to request a quote for your next project.